Send Message
Home News

Steps of Precision Casting Electro-Coating

I'm Online Chat Now
Certification
China Ningbo Suijin Machinery Technology Co.,Ltd certification
China Ningbo Suijin Machinery Technology Co.,Ltd certification
Customer Reviews
Quick and reliable casting and machining partner

—— Marcos Dominoni

Good impressed with professional management and good quality service

—— American customers

We like their electropolishing, it looks great.Also the quality of material is very good. I will be honest with you.

—— Farman

Company News
Steps of Precision Casting Electro-Coating
Latest company news about Steps of Precision Casting Electro-Coating

pre-cleaning → degreasing → water washing → rust removal → water washing → neutralization → water washing → phosphating → water washing → passivation → electrophoretic coating → tank top Cleaning → ultrafiltration water washing → drying → offline.

 

(2) The substrate and pretreatment of the coated object have a great influence on the electrophoretic coating film.

Metal castings are generally derusted by sandblasting or shot blasting, cotton yarn is used to remove floating dust on the surface of the workpiece, and sandpaper is used to remove residual steel shots and other debris on the surface. The steel surface is treated with degreasing and rust removal. When the surface requirements are too high, phosphating and passivation surface treatments are required. Ferrous metal workpieces must be phosphated before anodic electrophoresis, otherwise the corrosion resistance of the paint film will be poor. In phosphating treatment, zinc salt phosphating film is generally selected, with a thickness of about 1 to 2 μm, and the phosphate film is required to have fine and uniform crystals.

 

(3) In the filtration system, the primary filtration is generally adopted, and the filter is a mesh bag structure.

The electrophoretic paint is transported to the filter through a vertical pump for filtration. Considering the comprehensive replacement cycle and the quality of the paint film, the filter bag with a pore size of 50μm is the best. It can not only meet the quality requirements of the paint film, but also solve the problem of filter bag clogging.

 

(4) The size of the circulation system of electrophoretic coating directly affects the stability of the bath and the quality of the paint film.

Increasing the circulation volume reduces the precipitation and bubbles of the bath liquid; however, the aging of the bath liquid accelerates, the energy consumption increases, and the stability of the bath liquid becomes worse. It is ideal to control the cycle times of the tank liquid to 6-8 times/h, which not only guarantees the quality of the paint film, but also ensures the stable operation of the tank liquid.

 

(5) As the production time increases, the impedance of the anode diaphragm will increase and the effective working voltage will decrease.

Therefore, in production, the operating voltage of the power supply should be gradually increased according to the voltage loss to compensate for the voltage drop of the anode diaphragm.

 

(6) The ultrafiltration system controls the concentration of impurity ions brought by the workpiece to ensure the quality of coating.

In the operation of this system, it should be noted that once the system is in operation, it should run continuously and it is strictly prohibited to run intermittently to prevent the ultrafiltration membrane from drying up. The dried resin and pigment adhere to the ultrafiltration membrane and cannot be cleaned thoroughly, which will seriously affect the water permeability and service life of the ultrafiltration membrane. The water output rate of the ultrafiltration membrane shows a downward trend with the running time. It should be cleaned once for 30-40 days of continuous work to ensure the ultrafiltration water required for ultrafiltration leaching and washing.

 

(7) The electrophoretic coating method is suitable for the production process of a large number of assembly lines.

The renewal cycle of the electrophoresis bath should be within 3 months. The scientific management of the bath is extremely important. Various parameters of the bath are regularly tested, and the bath is adjusted and replaced according to the test results. Generally, the parameters of the bath solution are measured at the following frequency: the pH value, solid content and conductivity of the electrophoresis solution, ultrafiltration solution and ultrafiltration cleaning solution, anion (anode) polar solution, circulating lotion, and deionization cleaning solution once a day; Base ratio, organic solvent content, and laboratory small tank test twice a week.

 

(8) For the management of the quality of the paint film, the uniformity and thickness of the paint film should be checked frequently, and the appearance should not have pinholes, sagging, orange peel, wrinkles, etc. Regularly check the physical and chemical indicators such as the adhesion and corrosion resistance of the coating film.

The inspection cycle is in accordance with the manufacturer's inspection standards, and generally each batch needs to be inspected.

Pub Time : 2024-04-21 19:03:55 >> News list
Contact Details
Ningbo Suijin Machinery Technology Co.,Ltd

Contact Person: Mr. Fred Zhang

Tel: 0086 574 28861663

Fax: 86-574-28861665

Send your inquiry directly to us